- We presented our pitch to the group and received a range of positive feedback and improvement suggestions. These have been outlined in a previous blog post.
- We performed three location recces over the last few weeks with associated blog posts and video logs added to the blog.
- We have assembled the majority of our cast and created a Facebook group to bring them together and communicate information to them.
- We created mock-ups for our digipack and print advertisement designs.
- We created blog posts detailing our plans in terms of costumes, props and sound.
- We have created a detailed shot list outlining 88 key frames throughout the video.
- We have begun the story boarding process and have completed roughly half of the storyboard so far.
Over the next week we must achieve the following:
- Finish the storyboard
- Create an animatic to show a visual approximation of our video.
- Purchase or source any remaining props or costumes required.
No comments:
Post a Comment